New Passing Loop
On 15th June we used Jack’s Land Rover to haul the two prefabricated Y points out of Euroclydon tunnel, where they had been rusting away propped up against one side of the tunnel. Then on 22nd June Pat drove his Land Rover up from Devon, on the way collecting a 2 axle trailer from Chris at Old Sodbury. With a Tirfor winch the points were hauled onto the trailer and moved to Lea Bailey (the pressed steel sleepers of the…